Fuel handling, Zaragoza

Place of installation: Zaragoza, Spain

Scope of performance: 2 silo doors of 5 tons each, which are welded to the existing steel structure; conveyor belt stations reversible (L = approximately 40 m at height of approximately 12 m); 3 vertical transport screws (∅ = 900, L = 11,000 m) with gearing and drive system; 80 m suspended crane rails; 80 m troughed conveyor belt

Total weight: 170 tons

Construction time: 4 months

 


Impressions

 


Back

 

Search

Jobs

Inquiry

Contact

News